Qweak.QweakSchedule History

Hide minor edits - Show changes to markup

October 09, 2011, at 11:15 AM by 107.18.29.238 -
Added lines 1-2:



October 09, 2011, at 11:14 AM by 107.18.29.238 -
Added line 1:

(:nosections:)

April 25, 2011, at 11:59 AM by 24.78.131.175 -
Changed lines 3-4 from:
Status:

QPweak started production data taking in November of 2010 and is currently running.

Schedule:

The current run cycle will end May 13.

The second run cycle is scheduled to start in November 2011 and run through May 2012.

Production data taking will be completed in Summer of 2012.
Attach:Magnet_16.jpg Δ \\
to:
Status:

QPweak started production data taking in November of 2010 and is currently running.

Schedule:

The current run cycle will end May 13.

The second run cycle is scheduled to start in November 2011 and run through May 2012.

Production data taking will be completed by the Summer of 2012.
Attach:Magnet_16.jpg Δ
April 22, 2011, at 08:38 PM by 24.78.131.175 -
Changed line 3 from:
Status:

QPweak started production data taking in November of 2010 and is currently running.

Schedule:

The current run cycle will end May 13.

The second run cycle is scheduled to start in November 2011.

Completion of production data taking is scheduled for the summer of 2012.
Attach:Magnet_16.jpg Δ \\
to:
Status:

QPweak started production data taking in November of 2010 and is currently running.

Schedule:

The current run cycle will end May 13.

The second run cycle is scheduled to start in November 2011 and run through May 2012.

Production data taking will be completed in Summer of 2012.
Attach:Magnet_16.jpg Δ \\
April 22, 2011, at 08:37 PM by 24.78.131.175 -
Changed line 3 from:
Status:

QPweak started production data taking in November of 2010 and is currently running.

Schedule:

The current run cycle will end May 13.

The second run cycle is scheduled to start in November 2011.

* Completion of production data taking is scheduled for the summer of 2012.
Attach:Magnet_16.jpg Δ \\
to:
Status:

QPweak started production data taking in November of 2010 and is currently running.

Schedule:

The current run cycle will end May 13.

The second run cycle is scheduled to start in November 2011.

Completion of production data taking is scheduled for the summer of 2012.
Attach:Magnet_16.jpg Δ \\
April 22, 2011, at 08:37 PM by 24.78.131.175 -
Changed lines 3-7 from:
Status:

QPweak started production data taking in November of 2010 and is currently running.

Schedule:

The current run cycle will end May 13.

The second run cycle is scheduled to start in November 2011.
Attach:Magnet_16.jpg Δ

Two blocks of 6 month production data taking are planned. The first one will begin in late September 2010 and the second one around the same time in 2011.

Completion of production data taking is scheduled for the summer of 2012.

to:
Status:

QPweak started production data taking in November of 2010 and is currently running.

Schedule:

The current run cycle will end May 13.

The second run cycle is scheduled to start in November 2011.

* Completion of production data taking is scheduled for the summer of 2012.
Attach:Magnet_16.jpg Δ
April 22, 2011, at 08:36 PM by 24.78.131.175 -
Changed line 3 from:
Status:

QPweak started production data taking in November of 2010 and is currently running.

Schedule:The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
to:
Status:

QPweak started production data taking in November of 2010 and is currently running.

Schedule:

The current run cycle will end May 13.

The second run cycle is scheduled to start in November 2011.
Attach:Magnet_16.jpg Δ \\
April 22, 2011, at 08:33 PM by 24.78.131.175 -
Changed line 3 from:
QPweak started production data taking in November of 2010.

The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
to:
Status:

QPweak started production data taking in November of 2010 and is currently running.

Schedule:The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
April 22, 2011, at 08:32 PM by 24.78.131.175 -
Changed line 3 from:
QPweak started production data taking in November of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
to:
QPweak started production data taking in November of 2010.

The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
April 22, 2011, at 08:31 PM by 24.78.131.175 -
Changed line 3 from:
QPweak *started production data taking in November of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
to:
QPweak started production data taking in November of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
April 22, 2011, at 08:30 PM by 24.78.131.175 -
Changed line 3 from:
QPweak started production data taking in November of 2010. \\ The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
to:
QPweak *started production data taking in November of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
April 22, 2011, at 08:29 PM by 24.78.131.175 -
Changed lines 3-5 from:

The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector ||Attach:Magnet_16.jpg Δ \\

to:
QPweak started production data taking in November of 2010. \\ The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
April 22, 2011, at 08:29 PM by 24.78.131.175 -
Changed lines 3-5 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
to:

The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector ||Attach:Magnet_16.jpg Δ \\

August 10, 2010, at 12:14 AM by Gericke -
Changed line 5 from:

The University of Manitoba subatomic physics group has made large scale contributions to the experiment, from the very beginning. We have contributed to the design, simulation, and construction of the experiment as a whole, and specifically to the main detector system and the QTOR spectrometer (see Figure above). We continue to now put much of our effort into installation and commissioning, as well as data analysis and DAQ setup related programming. \\

to:

Two blocks of 6 month production data taking are planned. The first one will begin in late September 2010 and the second one around the same time in 2011. \\

Changed lines 7-9 from:

The experiment is scheduled to being production running in the Fall of 2010.

More detailed information about the experiment and our work on it can obtained by following the menu links at the top of the page.

to:

Completion of production data taking is scheduled for the summer of 2012.

August 10, 2010, at 12:03 AM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
August 09, 2010, at 11:30 PM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:
The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:

The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
August 09, 2010, at 11:30 PM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.
These consist of:
The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.

These consist of:
The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
August 09, 2010, at 11:29 PM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:
The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned.
These consist of:
The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
August 09, 2010, at 07:35 PM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:
The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:
The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
August 09, 2010, at 07:33 PM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:
The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:
The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:Magnet_16.jpg Δ \\
August 09, 2010, at 06:11 PM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:
The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:
The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 06:10 PM by Gericke -
Changed lines 3-4 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:
The Spectrometer
The Main Detector
Attach:ExpStatusSlideShowNonStopCycle.swf Δ
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:
The Spectrometer
The Main Detector
The Scanner
The Compton Electron Detector
Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 05:56 PM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: * The Spectrometer
* The Main Detector
Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:
The Spectrometer
The Main Detector
Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 05:56 PM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: *The Spectrometer
*The Main Detector
Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: * The Spectrometer
* The Main Detector
Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 05:55 PM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: *The Spectrometer *The Main DetectorAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: *The Spectrometer
*The Main Detector
Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 05:54 PM by Gericke -
Changed lines 3-4 from:
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: *The Spectrometer *The Main DetectorAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 05:54 PM by Gericke -
Changed lines 3-4 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: *The Spectrometer *The Main DetectorAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
August 09, 2010, at 05:54 PM by Gericke -
Changed lines 3-5 from:
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: *The Spectrometer *The Main DetectorAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 05:52 PM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:
to:
August 09, 2010, at 05:52 PM by Gericke -
Changed line 5 from:
to:
August 09, 2010, at 05:52 PM by Gericke -
Changed lines 3-5 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: \\ The SpectrometerAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:
The SpectrometerAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 05:51 PM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:\\ The SpectrometerAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: \\ The SpectrometerAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 05:51 PM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: The SpectrometerAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:\\ The SpectrometerAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 05:45 PM by Gericke -
Changed line 3 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: The SpectrometerAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: The SpectrometerAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 05:44 PM by Gericke -
Changed lines 3-5 from:
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: The SpectrometerAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 05:44 PM by Gericke -
Changed line 3 from:
to:
August 09, 2010, at 05:43 PM by Gericke -
Changed lines 3-5 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: \\The SpectrometerAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
August 09, 2010, at 05:41 PM by Gericke -
Changed lines 3-4 from:
to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of: \\The SpectrometerAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 05:41 PM by Gericke -
Changed lines 3-4 from:
to:
August 09, 2010, at 05:41 PM by Gericke -
Changed lines 3-5 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:\\ The SpectrometerAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
August 09, 2010, at 05:40 PM by Gericke -
Changed lines 3-5 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:The Spectrometer

Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\

to:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:\\ The SpectrometerAttach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 05:40 PM by Gericke -
Changed lines 3-7 from:

The Spectrometer

to:
Attach:ExpStatusSlideShowNonStopCycle.swf Δ' >
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:The Spectrometer

Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\

August 09, 2010, at 05:39 PM by Gericke -
Changed line 3 from:
to:
August 09, 2010, at 05:39 PM by Gericke -
Changed lines 4-6 from:

The Spectrometer
The Main Detectors
The Scanner \\

to:

The Spectrometer

August 09, 2010, at 05:37 PM by Gericke -
Changed lines 3-8 from:
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
August 09, 2010, at 05:25 PM by Gericke -
Changed line 3 from:
Attach:ExpStatusSlideShowNonStopCycle.swf Δ' >
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel.Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\
to:
Attach:ExpStatusSlideShowNonStopCycle.swf Δ' >
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel. The main subsystems for which the Canadian team has taken responsibility are nearly commissioned. These consist of:Attach:ExpStatusSlideShowNonStopCycle.swf Δ \\
August 09, 2010, at 11:57 AM by Gericke -
Changed lines 1-10 from:

Schedule

to:

The QPweak Schedule and Status:

Attach:ExpStatusSlideShowNonStopCycle.swf Δ' >
QPweak is scheduled to take production data starting in late September of 2010. The experiment installation is now nearly completed and commissioning of installed components is proceeding in parallel.Attach:ExpStatusSlideShowNonStopCycle.swf Δ

The University of Manitoba subatomic physics group has made large scale contributions to the experiment, from the very beginning. We have contributed to the design, simulation, and construction of the experiment as a whole, and specifically to the main detector system and the QTOR spectrometer (see Figure above). We continue to now put much of our effort into installation and commissioning, as well as data analysis and DAQ setup related programming.

The experiment is scheduled to being production running in the Fall of 2010.

More detailed information about the experiment and our work on it can obtained by following the menu links at the top of the page.

February 24, 2010, at 02:54 PM by Michael Gericke -
Added line 1:

Schedule